NorCal Controls BESS Installation – El Dorado Hills, CA
Trident Electric completed a large, highly technical design-build Battery Energy Storage System (BESS) installation for NorCal Controls in El Dorado Hills, California. The project required detailed engineering coordination to integrate a large-scale battery backup system into an existing electrical infrastructure supporting both rooftop solar and ground-mounted solar arrays.
Trident collaborated closely with NorCal Controls’ executive and engineering teams to develop the system design, perform required electrical calculations, and plan the installation sequencing to ensure seamless integration and long-term reliability. The project involved complex power distribution coordination and alternative energy systems engineering, executed within an active industrial environment. The client was extremely satisfied with the final result and overall project execution.
General Contractor: Trident Electric
Client / End User: Nor-Cal Controls